|
You are here »» Home »» Air Conditioning »» Installation
MAIN WORKSHOP:
Our 70 SQ. Meter spacious workshop located in Kawempe, is well designed and equipped with modern test equipment and fabrication equipments to tackle any workload.
WORKSHOPS KITS:
- Bending Machines
- Shearing Machines
- Rolling Machines
- Grooving machines
- Welding Machines
- Drilling Machines
- Brazing Kits
- Vacuum Pumps
- Air Compressors
- Flare Kits
- Pressure Gauges
- Leak Detectors
- Hot Air Blowers
- Vacuum Cleaners
It is important to state that Air Conditioners are more standardized products where ROKO Technical Services have in terms and warranty (lasts up to one year). Some of the key clients include:
| Bank of Uganda - Air Conditioning |
| Parliament House/Building
- Air Conditioning |
| Sabena Airlines - Air
Conditioning |
Air conditioning of switching
Stations
Uganda Telecom Limited
|
| US Embassy premises - Air
Conditioning |
| Metro Cash and Carry -
Air Conditioning |
| URA Long Room - Air Conditioning |
| Transit Lounge for Civil
Aviation Authority - Air Conditioning |
| AGOA TRI-STAR (Bugolobi)
- Air Conditioning |
| Crested Towers - Air Conditioning
& Ventilation |
| RAFU - Air Conditioning |
| Embassy of Japan - Air
Conditioning |
|